Have Your Say

Southport Toilet Refurbishment

Consult

In 2023 the public toilets on Lady Bay Road, Southport are scheduled to be upgraded. Proposed renovations include replacing all fixtures, safety and hygiene improvements, and a more aesthetically pleasing exterior.

Vote for your preferred option

We invite you to complete a 2-minute survey to choose a design for the exterior of the building.

Printed copies of the survey are available from the Huon Valley Hub, or by contacting Huon Valley Council.

Submissions close 31 January 2023.

Attend an information session

Drop by for a chat with Council’s Community Engagement Officer.

Information session
Saturday 21 January 2023
10am – 1pm
Corner Huon Highway and Lady Bay Road, Southport

Proposed improvements

  • Interior and exterior painting and cosmetic improvements
  • New toilet cubicles and changing cubicles
  • New roofline to increase rainwater collection and new 25,000L rainwater tank
  • Non-slip epoxy floor coatings, LED sensor lighting, baby change tables and electric hand dryers
  • Service duct for water pumps and cleaning equipment storage
  • Rubbish bin storeroom with incorporated waste disposal chutes

Design options prepared by Ford Building & Design.

Key Dates

  • 21/12/2022 Consultation opens
  • 21/1/2023 On-site information session
  • 31/1/2023 Consultation closes
  • 22/2/2023 Council Report

Project Cycle

  1. Consultation opens
  2. Information session
  3. Consultation closes
  4. Under review
  5. Council Report
  6. Work commenced
  7. Project completed